San Bernardino County Solid Waste Management Division constructed a new 5.5-acre lined waste cell to accept residents’ waste at the Landers Sanitary Landfill. The project which took nine months was…
27 results
Category: Projects
The Culvert Crossing at Oak Glen Road and Birch Creek was damaged, beyond repair, during Tropical Storm Hillary on August 20th. The County has been working expeditiously to replace the…
The road improvements in the Chino and Montclair Area #5 started October 2022 and were completed in August 2023. The work consists of milling and overlaying with various resurfacing treatments…
The road improvements in the Chino and Montclair Area #4 started October 2022 and were completed in August 2023. The work consists of milling and overlaying with various resurfacing treatments…
Public Works has completed the Valley Boulevard and Other Roads Project in the Bloomington Area. The Project was funded with Senate Bill 1 (SB 1) Road Maintenance and Rehabilitation Account…
The road improvements in the Chino and Montclair Area #3 started March 2023 and were completed in May 2023. The work consists of milling and overlaying with various resurfacing treatments…
The work consists of milling and overlaying with various resurfacing treatments including rubberized hot mix asphalt, geotextile membrane, scrub seal, slurry seal, chip seal, leveling course, and striping. A few…
Following heavy rains on September 12, 2022, Oak Glen experienced significant mud and debris flows. In response, the Flood Control District (FCD) collaborated with the Natural Resources Conservation Service (NRCS)…
Providing professional engineering and environmental services for the replacement of 6 timber bridges located along National Trails Highway, in the Amboy, and Essex areas. Design Services RFP – August 2023.
To enhance safety and effectively monitor potential flood risks, the Flood Control District (FCD) has installed 18 additional flood control cameras. These cameras have been positioned in key locations throughout…