The Project is for the improvement of the drainage system along Saw Mill Drive. This consists of constructing concrete-lined channels, asphalt curbs and replacing existing pipes with concrete box structures.
The Project is for the improvement of the drainage system along Saw Mill Drive. This consists of constructing concrete-lined channels, asphalt curbs and replacing existing pipes with concrete box structures.