The work consists of milling and overlaying with various resurfacing treatments including rubberized hot mix asphalt, geotextile membrane, scrub seal, slurry seal, chip seal, leveling course, and striping. A few…
55 results
Category: Projects
The San Bernardino County Public Works Department has completed the Sand Canyon Road Project in the Redlands Area (Project). The Project was funded by Discretionary General Funding allocated for the…
Work consists of repainting roadway striping and pavement markings including School Zone advisory legends, speed limit legends, Stop Ahead / Stop / limit line legends, and cross walks in the…
The project consists of a reconstruction of sidewalk located in the San Bernardino Area. The improvements include construction of a sidewalk, curb and gutter, and asphalt patch back in accordance…
The Project consists of road improvements and maintenance of approximately 1.1 miles of road. The improvements include pavement reconstruction and rehabilitation, sidewalk infill, reconstructing existing curb ramps. All work for…
SCOPE OF WORK: Remove existing 250,000-gallon steel reservoir, install a temporary reservoir, and construct a new 345,000-gallon bolted steel reservoir in its place located on APN 0469-211-23 in the community…
The San Bernardino County Public Works Department has completed the Laurel Avenue Sidewalk Project in the Bloomington Area. The project was funded by the developer fee payment to Bloomington Infrastructure…
The San Bernardino County Public Works Department has completed the Redwood Avenue and Other Roads Project in the Fontana Area. The project was funded by the County’s Measure “I” Local…
Crews work in Trona area on shoulder erosion repairs. To date the area has had 4.73 inches of rain this season when yearly the average is about 2.30 inches. Crew…
The San Bernardino County Public Works Department has completed the City Creek Road Guardrail Replacement Project in the Running Springs Area. The project was funded by Gas Tax to reconstruct…