Public Notices
Bridge Fire – Burned Area Emergency Response Assessment – Technical Report – Posted October 16, 2024
CSA 70J Reservoir 3A Expansion
Summit Valley Road Maintenance Scheduled November 1, 2022
Hawker Crawford Storm Drain Flood Project – Final Public Notice – POSTED OCTOBER 6, 2022
Chino and Montclair Area Overlay Project
Fawnskin Sewer/Water Temporary Shutdown – September 8th
Stanfield Cutoff Intersection Improvements
Wabash Avenue and Other Roads in Redlands, Mentone and Yucaipa
Chino/Montclair Area Overlay Project Improvements
Muscoy and Vermont Elementary School – Street and Sidewalk Improvements – ENGLISH/SPANISH
Oro Grande Cement Plant – EMSW Conversion Facility
Cactus/Jurupa Avenue Street Improvements
Alder Avenue Street Improvements
Solid Waste Countywide Integrated Waste Management Plan 2022 Five-Year Review Report
- Source Reduction & Recycling Element and Household Hazardous Waste Element
- 5 – Year Review Letter
- Non-Disposal Facility Element
- Countywide Siting Element
- Countywide Summary Plan
Hawker Crawford Storm Drain Flood Project Flood Control District Initial Public Notice
Colton Sanitary Landfill – Final Closure/Post-Closure Maintenance Plan
Slover Avenue at Alder Avenue, Locust Avenue and Linden
Garnet Street, Florida Street and Greenspot Road Improvements Public Notice
National Trails Highway Public Notice
Black Mountain Quarry Plant – Kiln 2 Conversion Facility – Initial StudyCarbon Canyon Channel – Final Initial Study/Mitigated Negative Declaration
Public Notice – Balsa Ave and Others
Carbon Canyon Project Fact Sheet, Frequently Asked Questions and 3D Renderings
Carbon Canyon – Notice of Extended Public Comment Period
West Fontana Channel (Banana to Hickory) Flood Control Improvement Project
Santa Ana River Trail Phase 4 Reach A – IS
Lone Pine Canyon Road at Sheep Creek Project
Sunburst Trail Draft IS-MND with appendices
Spring Valley Lake Paving Project
Initial Study/Mitigated Negative Declaration San Bernardino County Flood Control District
Lenwood Spreading Grounds – Biological Resources Technical Report
Chris Basin Annual Routine Maintenance and Bacteria Reduction Pilot Project
Santa Ana River Trail, Phase IV, Reaches B & C Project
Flood Control District’s Master Stormwater System Maintenance Program (MSWMP) – Draft
Flood Control District’s Master Stormwater System Maintenance Program (MSWMP)
Elder Creek Project
Elder Creek Draft IS Checklist
Lenwood Facilities Maintenance and Improvements Project
Initial Study/Mitigated Negative Declaration San Bernardino County Flood Control District
Lenwood Spreading Grounds – Biological Resources Technical Report
Chris Basin Annual Routine Maintenance and Bacteria Reduction Pilot Project
Santa Ana Regional Water Quality Control Board Water Quality Certification Program
Santa Ana River Trail, Phase IV, Reaches B & C Project
West State Street Storm Drain
West State Street – Benson/Mountain
West State Street – Central/Mountain
Cross Sections for West State Street
Rimforest Storm Drain Project
Rimforest Final EIR
Rim Forest Storm Drain
Recirculated Draft Environmental Impact Report
Notice of Availability/Completion of a Recirculated (Revised) Draft Environmental Impact Report
Rim Forest Drainage Volume I (36 MB)
Rim Forest Drainage Volume II (8 MB)
Rim Forest Drainage Volume III (23 MB)
Rim Forest Drainage Volume IV (14 MB)
Rim Forest Exhibit F
Rim Forest Storm Drain Draft EIR NOC/NOA
Rim Forest Storm Drain Draft EIR
Rim Forest Storm Drain Draft Appendices
Notice of Preparation of EIR
Initial Environmental Study
First Line of Defense Basins’ Routine Maintenance Project – Draft Initial Study (IS) and Mitigated Negative Declaration (MND)
Notice of Availability/Notice of Intent to Adopt a Mitigated Negative DeclarationTechnical Documents
Draft Air Quality Impact Analysis Report
Draft Biological Technical Report
Draft Cultural Resources Inventory Report with Appendices
Draft GHG Analysis Report
Draft Noise Impact Analysis Report
Mid-Valley Landfill Permit Revision Project
Flood Control District’s Master Stormwater System Maintenance Program (MSWMP)
San Bernardino County Route 66 Bridge Replacement Project
Notice of Preparation of a Draft Environmental Impact Report
Institution Road Reconstruction
Institution Road Reconstruction – Initial Study Mitigated Negative Declaration (23 MB)
Institution Road Reconstruction – Notice of Intent
West Fontana Channel Flood Control Improvement Project
Initial Study for the West Fontana Channel Flood Control Improvement Project (18 MB)
Desert Knolls Wash
Desert Knolls Wash – Notice of Intent to Adopt a Mitigated Negative Declaration (27 MB)
Desert Knolls Wash-Initial Environmental Study
Desert Knolls Wash